Home / Services / Surface Preparation

#05 SURFACE PREPARATION & SUITABLE MATERIALS

Check what the new finish will sit on — before it goes on.

A new benchtop, splashback or floor is only as sound as what sits underneath it. During the on-site assessment for a kitchen renovation in Brighton, Ivan Bodnar checks moisture, substrate suitability, service access and underlying damage, so the written quotation reflects the preparation your kitchen actually needs.

or call 0413 142 055

01 — THE FOUR CHECKS

What gets looked at behind the visible finishes

#01 MOISTURE

Under the sink, behind the dishwasher and along the splashback line. Swollen board, staining or soft spots point to water that a new finish would cover, not fix.

#02 SUBSTRATE

Whether walls, floor and carcasses are flat, solid and suitable for the tile, panel or flooring proposed. Adhesive and fixings need a sound base to hold.

#03 SERVICE ACCESS

Where plumbing and electrical connections sit, and whether they can still be reached once new work is in place. Any change to them is for licensed trades.

#04 UNDERLYING DAMAGE

Loose plaster, damaged floor sections or tired earlier repairs that show up once the existing surface is examined closely.

02 — MATERIALS BY SURFACE

Suitable materials follow the surface

Choosing a benchtop, splashback or floor finish starts with what it will be fixed to. Once the condition is known, the options can be discussed honestly, including where the existing base is fine to keep. See Layout, Cabinetry & Practical Options for the wider picture.

BENCHTOP
Whether the cabinet run below is level, well supported and sound enough to carry the new top.

SPLASHBACK
Wall flatness, the condition of plaster or old tiles, and signs of moisture near the sink and cooktop. More in Tiling & Kitchen Splashbacks.

FLOOR
Level and soundness of the base, and how cabinets and flooring meet. More in Flooring.

CABINETRY
Whether existing carcasses are sound enough to keep. Sometimes they are, sometimes not; it depends on inspection.

03 — AVOIDABLE REWORK

Why the order matters

Replacing visible finishes before checking moisture, substrate suitability, service access and underlying damage can cause avoidable rework. The appropriate scope depends on inspection.

FINISH FIRST

New tiles go over a wall that is still damp or uneven.

A benchtop sits on a cabinet run that is out of level.

Connections end up hidden where they cannot be reached.

CHECK FIRST

The cause of moisture is identified and addressed before tiling.

Support and level are confirmed before the top is fitted.

Service access is planned with the licensed trades involved.

04 — LIMITS & LICENSED TRADES

What an inspection can and cannot show

An on-site assessment cannot reveal every concealed issue. Some conditions only become visible once old cabinets, tiles or flooring come out. When that happens, Ivan explains what has been found and the practical options before work continues.

Ivan Bodnar is an independent sole trader and does not personally claim unverified trade licences or builder registration. Licensed plumbing and electrical work is performed by appropriately authorised specialists. Structural engineering, architecture and asbestos removal sit outside his scope. Project scope, permits, registration, insurance and licensed trade requirements vary, and contract, insurance and approvals wording is verified for each project. Read more in Licensed Trades & Regulated Work.
A tradesperson in protective clothing applies sealant around interior window or cabinet trim in a kitchen.

Reference photo · sealant applied around kitchen trim, once the surface behind it has been checked

05 — FURTHER READING

Start with what is already there

If your kitchen in Brighton has swollen cabinets, a tired splashback or a floor that isn’t quite level, an on-site assessment is a sensible first step. The assessment and the written quotation that follows are free.